Colorado River Aqueduct siphon repairs being rushed

Sponsored by

No injuries, property damage reported near desert hot springs

LOS ANGELES, March 7, 2003 -- The Metropolitan Water District is rushing to repair a broken underground pipe feeding water from the Colorado River Aqueduct which is sending a 40-foot geyser into the air.

Officials did not immediately give a cause for the break but said they are investigating. No injuries or property damage has been reported. Officials said this will not interrupt the flow of water to Southern California.

The break occurred in the district's Colorado River Aqueduct, which is north of Desert Hot Springs. The geyser was expected to dissipate over the next few hours as pressure is reduced by aqueduct shutdown, allowing crews to inspect and repair the siphon.

Metropolitan Water District of Southern California recently began running water through its 242-mile-long Colorado River Aqueduct after month-long repairs.

At about 9:30 a.m. Friday, Metropolitan's aerial and ground patrols saw water spouting from an underground pipe called Big Morongo Siphon. The aqueduct has been shut down east of Metropolitan's Hinds Pumping Plant along Interstate 10, just east of Chiriaco Summit, to allow for inspection and repair of the siphon.

Water being pumped from the Colorado River at Lake Havasu is being diverted from the aqueduct at the Hinds Plant into the spreading basin for Metropolitan's Hayfield Groundwater Storage Project, in the groundwater basin underlying the Hayfield area.

Full-service water deliveries are being maintained by Metropolitan to its 26 member public water agencies throughout the region, as they have during the past month's shutdown and repairs on the Colorado River Aqueduct.

Supplies are being received from State Water Project aqueduct from Northern California, and from Metropolitan's nine reservoirs throughout the region.


Sponsored by

TODAY'S HEADLINES

Stockholm to upgrade major WWTP with advanced MBR technology

Stockholm Vatten is set to receive new membrane bioreactor equipment from GE for the Henriksdal municipal wastewater treatment plant as part of an upgrade to its existing technology, making it the largest MBR plant in the world.

SFPUC announces completion of $340M Hetch Hetchy water tunnel project

The San Francisco Public Utilities Commission recently announced that after more than four years of construction, a new 3.5-mile-long seismically-improved tunnel is now delivering water to 2.6 million people in the San Francisco Bay Area.

New partnership paves way for advanced use, treatment of biosolids as a fertilizer

Nutrients Plus and Encina Wastewater Authority recently announced a unique public-private joint venture that elevates the standards and safety requirements for treating and using biosolids as a fertilizer.

Magnetrol announces opening, expansion of several key locations worldwide

Magnetrol International, a specialist in level and flow measurement instrumentation, has announced that it recently expanded and opened several key locations.

FOLLOW US ON SOCIAL MEDIA