Smart metering program to benefit Florida co-op's water customers

Sponsored by

RALEIGH, NC, Apr. 5, 2011 -- As part of its advanced metering infrastructure (AMI) and smart metering program, Talquin Electric Cooperative is in the process of installing iPERL residential water meters, which are read by the Sensus FlexNet communications network.

Talquin, Florida's 5th largest distribution electrical cooperative, is moving from manual water meter reads to wireless reading to improve data accuracy and timeliness and reduce the number of utility truck rolls.

The co-op is also upgrading its electric meters, installing ones equipped with remote connect and disconnect.

The smart meter installation, which will serve all 54,000 residential, commercial and industrial members in Talquin's 2,600 square mile territory, began in December 2010. The co-op estimates that installation of all electric and water meters will be complete by late 2011 to early 2012.

Talquin is one of a few co-ops nationwide to receive an American Recovery and Reinvestment Act (ARRA) grant from the U.S. Department of Energy for its smart grid program.

###

Sponsored by

TODAY'S HEADLINES

Innovative carbon-neutral wastewater treatment plant unveiled in California

The EPA recently joined the Bureau of Reclamation, California Energy Commission and Congressman Col. Paul Cook at the ceremonial start of Victor Valley Wastewater Reclamation Authority's carbon-neutral energy project located at ITS wastewater treatment facility in Victorville, Calif.

Scottish Water to spend £3.5 billion on infrastructure improvements

Utility Scottish Water will invest £3.5 billion investment over six years to improve drinking water supplies, wastewater discharge and water mains...

Conquering Everest’s water contamination problem

A Ball State University team from Indiana is working to bring clean drinking water to a small, isolated community in mountainous Nepal that lies in the middle of the heavily congested pathway to Mount Everest...

MD counties to undergo major six-year water, wastewater design project

Louis Berger has been awarded a $4-million, three-year contract with the Washington Sanitary Suburban Commission for a water and sewer design project focusing on financing water and sewer reconstruction programs and inspection and repair of critical water and sewer infrastructure.

FOLLOW US ON SOCIAL MEDIA