Bangdung’s water supply system set for reform with Mott MacDonald

Sponsored by

Indonesia’s National Development Planning Agency has commissioned Mott MacDonald to prepare a water supply master plan to address water shortages in Indonesia’s third largest city, Bandung, and its surrounding areas.

The project is due for completion in 2014 and includes a management plan for groundwater upper catchment management areas. The consultancy will also identify reforms needed to strengthen the water supply system.

Bandung lies on the Citarum river basin, which provides 80% of the water consumed in the capital city Jakarta and surrounding areas. It supports a population of about 30 million, contributes 20% of the country’s industrial outputs and produces 5% of the country’s rice.

Watershed degradation, rapid urbanization and industrialization, as well as slow development of surface water sources, have created overdependence on groundwater as a primary source of water.

As a result, the rate of water extraction from local aquifers significantly exceeds recharge rates, with water tables declining at more than 1 metre a year in some areas. This has led to acute water stress and depletion of aquifers in major urban areas such as Bandung.

###

Sponsored by

 


TODAY'S HEADLINES

Interior releases updated hydraulic fracturing draft rule for public, Indian lands

The Dept. of the Interior released an updated draft proposal establishing safety standards for hydraulic fracturing on public and Indian lands.

PA American Water marks completion of $101M Pittsburgh water treatment project

Pennsylvania American Water marked the completion of $101M in upgrades to Pittsburgh water treatment plants to improve service and public safety.

GE membrane technology to be installed at largest European drinking water plant

Erope's largest drinking water purification plant to feature GE's ZeeWeed* 500 water treatment technology is under construction in Ravenna, Italy.

Groundwater, soil cleanup begins at CA Superfund site

EPA announced that work will begin this week to address soil and groundwater contamination at the Pacific Pipeline Superfund Site in Fillmore, Calif.

© 2013. PennWell Corporation. All Rights Reserved. PRIVACY POLICY | TERMS AND CONDITIONS