NC water treatment plant installs major reverse osmosis system

Sponsored by


July 3, 2014 -- Earlier this year, Biwater, a global provider of large-scale water and wastewater solutions, started engineering and fabrication work to support Dixon Water Treatment Plant improvement works carried out by Onslow Water and Sewer Authority (ONWASA) near the city of Jacksonville, N.C.

This month, Biwater Engineers completed the delivery of a custom three-million-gallon-per-day (MGD) reverse osmosis (RO) plant, inclusive of pre-treatment cartridge filtration, chemical dosing, membrane cleaning system, plant instrumentation, remote IO stations, PLC, and SCADA.

Reverse osmosis trains being delivered to site


With this speedy delivery, residents in Jacksonville will soon be benefiting from increased potable water production capacity, combined with specialized treatment and removal of silica and organics from the influent. The advanced system will treat unusable brackish well water and provide drinking water that meets Environmental Protection Agency (EPA) standards.

The custom RO trains and accompanying equipment for this project were designed and assembled in Biwater's factory in California, tested and then shipped semi-assembled to the site, which aided the overall speed of delivery and subsequent supervision of installation.

Jerry Orlanes, Field Service Specialist, testing equipment before shipping semi-assembled to site
Contracted under T.A. Loving Company to deliver an appropriate technological solution to increase capacity and improve water quality, Biwater anticipates successfully commissioning the facility in the coming months. Kimley-Horn is ONWASA's Design Engineer on the project.

See also: "NC state, British Virgin Islands to receive vital water infrastructure projects"


About Biwater

Biwater provides large-scale water and wastewater solutions for clients across the world. The company's desalination business serves both municipal and industrial clients. It is a premier membrane system manufacturer, particularly for large capacity systems, producing high purity drinking water. The company currently has more than 440 MGD of installed membrane treatment capacity globally. For more information, visit www.biwater.com.

###

Sponsored by

TODAY'S HEADLINES

Online Zeta Potential Measurement Provides Water Treatment Control, Cost Reduction

Online zeta potential measurements can provide real-time water quality monitoring and support effective process control under all circumstances. The value of online measurement is illustrated through the experiences of Aurora Water, which is using zeta potential at one facility as both an offline and online tool for monitoring and controlling water treatment processes.

Pacific Institute issues helpful analysis of CA water bond to better inform Nov voters

Voters on CA's November ballot will be asked whether to approve Proposition 1, the Water Quality, Supply and Infrastructure Improvement Act. As such, the Pacific Institute has released an objective new report that helps voters untangle the complexities of the water bond measure.

Research offers unique insight into monitoring groundwater at Ohio fracking sites

A new research project at the University of Cincinnati is taking a groundbreaking approach to monitoring groundwater resources near fracking sites in the state of Ohio.

EPA announces preliminary determination to regulate strontium in drinking water

EPA has announced that it has officially made a preliminary determination to regulate strontium in U.S. drinking water. Strontium is a naturally occurring element that, at elevated levels, can impact bone strength in individuals who do not consume enough calcium.

FOLLOW US ON SOCIAL MEDIA