Mott MacDonald designing Tideway’s East tunnel section of London super sewer

Jan. 29, 2016
Consultancy Mott MacDonald will be designing the eastern section of the Thames Tideway Tunnel on behalf of a joint venture of Costain, VINCI Construction Grands Projets and Bachy Soletanche...

Consultancy Mott MacDonald will be designing the eastern section of the Thames Tideway Tunnel on behalf of a joint venture of Costain, VINCI Construction Grands Projets and Bachy Soletanche.

Tideway is delivering the biggest infrastructure project ever undertaken by the UK water industry, which will see 25km of tunnels constructed beneath London.

The East section package includes the construction of two tunnels – a 5.5km section of the main 25km tunnel and a 4.6km connecting tunnel for combined rainwater and wastewater – both of which will serve the east of London.

Located between 45m and 65m below ground, the two tunnels will be excavated by tunnel boring machines (TBMs) using slurry pressure balance technology.

The main tunnel will have an interior diameter of 7.2m, while the diameter of the connecting tunnel will be 5m.

The East section also includes the construction of five large shafts using diaphragm walls to a depth of 72m and with diameters of between 17m and 25m, maritime works on the Thames, associated structures connecting with the existing wastewater collection system and electromechanical works packages.

An optimisation phase, which includes design and methods, is almost completed and the design team are delivering the first conceptual designs using state-of-the-art building information modelling models and processes. The works are scheduled for delivery in 2023.

Michael Francis project director at Mott MacDonald, said: “It is fantastic to be involved in the creation of one of London’s most significant infrastructure projects. The East works package is the deepest section of the project, with tunnels driven by slurry TBMs deep in the chalk up to 70m below the water table. The deep shafts will be constructed using diaphragm walls and the complex hydraulic structures to divert flows require soil mixing ground treatment, secant piles and high-quality concrete meeting the 120 year design life.”

###

Read/Watch more

VIDEO: Take a tour of London’s new super sewer

Money, Money, Money: Tackling water’s thorny issue of cost

Help or Hindrance: Wastewater policy reform in England

Abu Dhabi’s wastewater project STEPs closer to completion

Sponsored Recommendations

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track

Automated Fresh Water Treatment

March 15, 2024
SCADA, Automation and Control for Efficient and Compliant Operations

Digital Transformation Enables Smart Water

March 15, 2024
During this webinar we will discuss factors driving the transformation to digital water, water industry trends, followed by a summary of solutions (products & services) available...

Automation for Water Treatment and Distribution Systems

Jan. 31, 2024
Dependable, Flexible Control Solutions to Maximize Productivity