Flooding leads to sewage spill in Grand Rapids, Mich.

April 19, 2017
38.7M gallons of sewage spilled into the Grand River from city retention basin. 

GRAND RAPIDS, MI, APRIL 19, 2017 -- Flooding last week caused 38.7 million gallons of partially treated sewage to flow into the Grand River from the city of Grand Rapids' Market Avenue Retention Basin.

The spill occurred over two days, from Tuesday, April 11, to Thursday, April 13, according to the city. The spill happened after heavy rainfall in the area caused river levels to rise to its 18-foot flood stage.

Michigan Live reports that the sewage was disinfected and dechlorinated.

The overflow occurred after several weeks of heavy rains pushed the Grand River close to its 18-foot flood stage in Grand Rapids. When the river is high, the city's Water Resource Recovery Facility pumps treated wastewater out to the river to make sure it discharges. Usually, the treated water passes through a large gate, but the gate was broken and allowed the water to flow back into the plant. The backflow caused a retention basin to overflow and spill partially treated wastewater into the river.

Read more here.

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track