Kleinfelder to study levees along San Joaquin River

Aug. 14, 2008
The California Department of Water Resources (DWR) has awarded Kleinfelder a $112.5 million, five-year contract to perform geotechnical levee evaluations along portions of the San Joaquin River Flood Control System. This is the largest geotechnical contract Kleinfelder has been awarded and the second-largest contract overall in company history. The initial levee evaluations will focus on 380 miles of non-urban project levees located generally south of Stockton, CA...

SACRAMENTO, CA, June 5, 2008 -- The California Department of Water Resources (DWR) has awarded Kleinfelder a $112.5 million, five-year contract to perform geotechnical levee evaluations along portions of the San Joaquin River Flood Control System. This is the largest geotechnical contract Kleinfelder has been awarded and the second-largest contract overall in company history.

The initial levee evaluations will focus on 380 miles of non-urban project levees located generally south of Stockton, Calif., as well as 60 miles of urban non-project levees in the Stockton area. The contract will likely also include other portions of the San Joaquin River levee system and levees in the San Joaquin River Delta.

"We are incredibly proud to have been selected among the many prestigious firms that competed for this project," said Bart Patton, chief operating officer at Kleinfelder. "Our team's dedication, expertise, experience and understanding of the DWR and its needs on this project all played an important role in our success."

As the prime contractor for this project, Kleinfelder will oversee the efforts of almost 40 subcontractors, including Sacramento-area firms Kjeldsen Sinnock Neudeck, Siegfried Engineering, and Neil O. Anderson and Associates. Kleinfelder-led teams will use a variety of techniques to complete the work, including such methods as cone penetration, test borings and aerial surveys using advanced Light Detection and Ranging (LiDAR) technology. The teams will document levee subsurface geotechnical conditions and analyze the impacts of these geotechnical conditions on the stability, settlement, seepage, erosion and seismic characteristics of the levees.

"We're excited to support the Department of Water Resources in this effort to better understand the critical levee system and related flood-control structures of the Central Valley," Patton said. "The results of these investigations are the foundation for a powerful tool that will help local communities and property owners better prepare for future flood events."

The data gathered from these levee investigations will go into the digital California Levee Database, which is under development. The data will also create the foundation for a levee certification program intended to provide a 200-year level of protection in urban areas and a 100-year level of protection in rural areas using criteria established by the U.S. Army Corps of Engineers.

The California DWR operates and maintains the State Water Project, provides dam safety and flood control and inspection services, assists local water districts in water management and water conservation planning, and plans for future statewide water needs.

The program manager for this contract will be Ron Heinzen, based out of Kleinfelder's Stockton office.

Kleinfelder is a provider of professional consulting services with nearly 50 years of experience.

###

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track