District opens historic LA River wetlands project

May 8, 2008
County of Los Angeles Supervisor Don Knabe (4th District) was joined by City of Long Beach Mayor Bob Foster and a host of municipal officials for the opening of the Dominguez Gap Wetlands in Long Beach. The $7 million treatment wetlands and spreading grounds project is the latest in a series of regional, multi-benefit projects implemented by the Los Angeles County Flood Control District. The wetlands project is one of the top five demonstration projects of the Los Angeles River Master Plan...

LOS ANGELES, CA, May 8, 2008 -- County of Los Angeles Supervisor Don Knabe (4th District) was joined by City of Long Beach Mayor Bob Foster and a host of municipal officials today for the opening of the Dominguez Gap Wetlands in Long Beach. The $7 million treatment wetlands and spreading grounds project is the latest in a series of regional, multi-benefit projects implemented by the Los Angeles County Flood Control District, including the Sun Valley Park and Tuxford Green projects in the Sun Valley Watershed and the Tujunga Wash Greenway and River Restoration project in the San Fernando Valley's Valley Glen community. The wetlands project is one of the top five demonstration projects of the Los Angeles River Master Plan.

The wetlands project is the first of its kind in the Los Angeles County region. It maintains the integrity of flood protection along the urban lower reaches of the river, while introducing new water quality elements, groundwater recharge, restoration of native habitat, pedestrian and equestrian trails, environmental education, and river bike trail enhancements.

The project encompassed extensive renovation of two preexisting Flood Control District spreading grounds, located along both sides of the Los Angeles River between Del Amo Blvd. and the 405 Freeway.

EAST BASIN: Enhancements to the 37-acre East Basin include one mile of constructed, treatment wetlands, pedestrian and horseback trails, two bird observation decks, woodland and riparian habitat, and a bike trail rest station. The wetlands will naturally treat from 2-3 cubic feet per second (1.3 to 3.2 million gallons a day) of stormwater and urban runoff -- enough water to fill five Olympic-size swimming pools. The result will be a significant reduction in the amount of fecal coliform, nutrients, heavy metals, organic carbons, and oil and greases within the runoff that is treated within the system. Trash booms will collect floatable trash, allowing it to be removed before it can foul the wetlands. Once treated, the runoff will be conveyed underneath the Los Angeles River to the project's West Basin for groundwater recharge.

WEST BASIN: The 15-acre West Basin remains a functional spreading grounds that, with new project improvements, will allow as much as 450 acre feet a year of water to permeate into the underground aquifer of the West Coast Groundwater Basin. In simplified terms, an acre foot of water is approximately the volume of one football field filled one foot deep and provides enough water for two families of four for one year.

Both the east and west basin areas are lush with a plant palette of shrubs, trees, brush and wildflowers native to the lower Los Angeles River, selected especially for this project by the County's project consultant, CH2M Hill.

Funding was provided by the Los Angeles County Flood Control District ($4 million), State Water Resources Control Board ($2.3 million), California Coastal Conservancy ($400,000), and Rivers and Mountains Conservancy ($200,000).

Historically, the Los Angeles River has been impaired by stormwater and urban runoff that collects on city streets and communities within the Los Angeles River Watershed. Polluted runoff is the result of harmful human activities like littering, illegally dumping automobile fluids and other contaminants into catch basins, and over-watering lawns. These activities, among others, have led to stringent federal regulations (known as Total Maximum Daily Load allocations or TMDLs) that restrict the amount of trash and other pollutants that may enter designated receiving waters. By 2016, cities and County areas within the Los Angeles River Watershed must effectively have zero trash going into the Los Angeles River.

###

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track