The QuickCamp™ System from McElroy allows operators to fuse pipe from 8" IPS to 36" OD (225 mm to 900 mm) day or night during severe weather conditions in a climate-controlled shelter that protects fusion joints from the elements. An operator can load and align pipe by remote control from inside with the MegaMc® PolyHorse® and MegaMc Rollers pipe-handling tools. A 1236/900 or 824/630 fusion carriage can also be moved by up to 18" so the pipe ends can be adjusted for proper face-off when pulling pipe through the shelter.
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...