Hobas Pipe

Houston, TX 77073

COMPANY OVERVIEW

About Hobas Pipe

Product Summary

A worldwide manufacturer of Centrifugally Cast Glass Fiber Reinforced Plastics (CC-GRP) pipe systems.

Contact

1413 E. Richey Road
Houston, TX 77073
http://www.hobaspipe.com
(281) 821-2200

More Info on Hobas Pipe

Hobas Logo 5fa309cba1001

HOBAS Pipe USA, Inc. is a producer and supplier of corrosion-resistant HOBAS centrifugally cast fiberglass reinforced polymer mortar pipe systems.  HOBAS Pipe USA is wholly owned by WIG Wietersdorfer Holding GmbH with product and process technology under license from Amiblu Holding Gmbh.

Products and Press Releases

Hobas Pipe USA
Pipe Placement Sliplining
May 31, 2021
Providence Water has taken vigilant measures before an issue becomes a disaster and embarked on a systematic and comprehensive inspection, repair, and risk assessment program....
Hobas Pipe
Busy Street Queens
March 2, 2021
Sewer line repairs including microtunneling and sliplining minimize disruption of service in the Borough of Queens, NY.
Hobas Pipe
Saws Slipline
Jan. 21, 2021
For the massive five-mile long pipeline project, the SAWS’ plan replaces the deteriorating and inadequate line with a product that are designed to last 100 years.
Interior View Of New Building
Oct. 30, 2020
An additional 32,000 square foot building has been added to the company's manufacturing facility.

Articles & News

The Village of Lombard, Ill.’s original lift station would become filled with solids during wet weather.
Dec. 15, 2020
The Village of Lombard, Ill., was evaluating the maintenance and operational costs of its Cambria Lift Station, which was experiencing service issues due to poor operation of ...
The Village of Lombard, Ill.’s original lift station would become filled with solids during wet weather.
Sept. 14, 2020
A lift station rehab project in the Village of Lombard, Ill. sought to repair the original steel can lift station with fiberglass lining.
Together with the new 225 million-gallon-per-day wet weather treatment facility at Blue Plains, this 7-mile tunnel segment reduces combined sewer overflows by more than 80%.
Sept. 14, 2019
The Division H – Anacostia River Tunnel, which holds 100 million gallons of combined sewage and measures 23 feet in diameter, was commissioned in late March 2019.
We1905 44
April 18, 2019
The project’s first section opens, promising cleaner water.
1809wwsp9 P01
Sept. 1, 2018
Hobas Pipe assists CSO improvement measures.
1805wws11 P01
May 1, 2018
Hydraulically efficient piping meets established drinking water standards.

Request More Information

By clicking above, I agree to Endeavor Business Media's Terms of Service and consent to receive promotional communications from Endeavor, its affiliates, and partners per its Privacy Notice. I also understand my personal information will be shared with the sponsor of this content, who may contact me about their offerings per their privacy policy. I can unsubscribe anytime.