Drought Conditions Force Utility to Use Colorado River for Drinking Water

July 6, 2021

Ute Water’s customers will start paying a 2% drought pumping impact rate on their bills to account for electric power and water treatment costs from using Colorado River water.

The Ute Water Conservancy District, serving Grand Junction and Mesa County, Colorado, has for the first time begun to mix Colorado River water into its Grand Mesa reservoir releases. 

According to The Colorado Sun, this action was taken to meet the water needs of 90,000 customers and preserve backup water supplies impacted by severe drought. Previously, drinking water has been drawn from runoff 11,000 feet high on Grand Mesa.

Ute Water is the largest water provider between Denver and Salt Lake City. The utility aims to protect supplies in its Jerry Creek reservoirs, which is 96% full, reported The Colorado Sun. According to the U.S. Drought Monitor, the utility’s Grand Valley service area is in a state of exceptional or extreme drought.

According to The Colorado Sun, Ute Water has rights to pull a small amount of water from the Colorado River, but its junior rights are likely to be cut off when river flows decrease. The utility’s reservoir water falls from the Grand Mesa reservoirs and water must be pumped up from the Colorado River to a treatment plant.

The utility began taking about 7 cubic feet per second from the Colorado River on June 10, about 14 acre-feet per day. 

Ute Water’s customers will start paying a 2% drought pumping impact rate on their bills to account for electric power and water treatment costs from using Colorado River water, reported The Colorado Sun. For customers who use about 3,000 gallons a month, the extra cost will be less than 50 cents. 

Of the 14 acre-feet a day Ute Water plans to use from the Colorado River, only approximately 1.4 acre-feet will be consumed and remainder goes back into sewage treatment plants for treatment and into the river toward the Utah border, according to The Colorado Sun. 

Read related content about the Western Water Crisis:

About the Author

Cristina Tuser

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track