The US Army Corps of Engineers Jacksonville District awarded a contract to the URS Corporation to construct a segment of a stormwater treatment area (STA) outside the Village of Wellington, Florida, by August 2003.
The US Army Corps of Engineers Jacksonville District awarded a contract to the URS Corporation to construct a segment of a stormwater treatment area (STA) outside the Village of Wellington, Florida, by August 2003. The STA 1-East Project encompasses some 10 square miles, located northeast of the Loxahatchee National Wildlife Refuge. URS will clear the site, grade the cell and construct a canal, levee and water control structures.
STAs are the key components of the largest ecosystem restoration program in the history of Florida.
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...