Biwater signs contract for Lodz wastewater project

Dec. 1, 2004
The UK company Biwater Treatment signed a construction, installation and refurbishment contract to extend a wastewater treatment plant in Lodz, Poland.

The UK company Biwater Treatment signed a construction, installation and refurbishment contract to extend a wastewater treatment plant in Lodz, Poland.

The two-year project will include the extension of three biological treatment lines, sludge thickeners and modernisation of a screen house. The plant serves a population of 750,000 and will prevent the discharge of 215 tonnes per day of sludge, sand and screenings into the river Ner. The plant will treat sewage from Lodz, Pabianice and Konstantynow to comply with Polish and European standards.

The city of Lodz is the second largest city in Poland and is situated in the centre of the country. The project is worth €12 million and was awarded to a joint venture between Biwater Treatment and Warbud SA of Poland.

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track