Click here to enlarge imageThe new vessels are to be built at Aker Yards’ shipyard in Turku, Finland, with the first already under construction. The first vessel, scheduled for delivery in Fall 2009, will be 220,000 gross registered tons when delivered to the world’s second-largest cruise operator, Royal Caribbean Cruises Ltd. The vessel will be over 40% larger than the next largest passenger ship in the world, with a length of 360 meters, a width of 47 meters, and accommodating 8,400 passengers and crew.
Hydroxyl Systems Inc.
Victoria, British Columbia, Canada
Enquiry No. XXX
Genesys launches membrane antiscalant software in China
Membrane Master 3, a scaling prediction software, is helping Genesys International tap into the rapidly expanding Chinese market. The company develops and manufactures antiscalants, membrane cleaners and biocides for the reverse osmosis (RO) membrane industry. This software predicts likely scalants in a membrane system and calculates the best remedy product to use and dosage rate.