Clarksville, TN storage tank waterproofed by Penetron

Jan. 7, 2021
PENETRON ADMIX was added to the concrete mix for the pre-stressed shotcrete tank to ensure a waterproof and durable underground structure.

EAST SETAUKET, N.Y. -- Construction of the Valleybrook Park equalization tank in Clarksville, Tennessee was completed in January 2021. PENETRON ADMIX was added to the concrete mix for the pre-stressed shotcrete tank to ensure a waterproof and durable underground structure.

Valleybrook Park is a neighborhood green space near downtown Clarksville, a city of about 160,000 inhabitants in Central Tennessee. The 8.4 acre park offers a walking trail, basketball & volleyball courts, grass playing fields, a covered pavilion, and restrooms. The Gallows Hollow Branch stream flows through the park.

As part of an overall $4.5 million park renovation and upgrade, the City of Clarksville mandated the installation of a sewer storage facility to equalize peak wastewater flows diverted from a 24 inch sanitary sewer. The project included a diversion structure, 24 inch force main, 24 inch gravity sewer, and a 3 million gallon wastewater storage tank.

A More Cost-Effective SolutionThe structural engineers at Hazen & Sawyer specified a competitive concrete waterproofing solution for the 3 million gallon wastewater storage tank. However, PENETRON ADMIX, a crystalline permeability-reducing concrete admixture, turned out to be a more cost-effective and value-engineered solution. A substitution request was submitted by Crowder Construction, the general contractor, and approved by the engineer.

Crom Construction used PENETRON ADMIX-enhanced shotcrete to waterproof the pre-stressed concrete wastewater storage tank. PENETRON ADMIX is easily dosed during batching for shotcrete applications and is spray-applied to the surface of the cleaned and prepared concrete. The proprietary chemicals in the admixture react with moisture in the concrete to form insoluble crystals throughout the entire matrix, making the concrete impermeable.

Tracing PENETRON in the Mix“Crom Construction utilized a PENETRON ADMIX-enhanced shotcrete on this Valleybrook Park project to improve the durability and waterproofing attributes of the shotcrete. The addition of the admixture had no effect on the concrete mix properties or set time and the tracing agent that helps to identify the presence of Penetron Admix was a desirable added benefit.”

Identifiable by a bright green tint in the bleed water, the non-toxic, non-staining tracer in PENETRON ADMIX provides construction and design teams with a reliable identification control tool – and proof that “PENETRON is in the mix.”

Sponsored Recommendations

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track

Automated Fresh Water Treatment

March 15, 2024
SCADA, Automation and Control for Efficient and Compliant Operations

Digital Transformation Enables Smart Water

March 15, 2024
During this webinar we will discuss factors driving the transformation to digital water, water industry trends, followed by a summary of solutions (products & services) available...

Automation for Water Treatment and Distribution Systems

Jan. 31, 2024
Dependable, Flexible Control Solutions to Maximize Productivity