WIFIA Program closes loan with Metropolitan St. Louis Sewer District

Dec. 21, 2018
  EPA's total credit assistance is now over $1.5 billion.  

ST LOUIS, DEC 21, 2018 -- The Metropolitan St. Louis Sewer District's $47.7 million loan will construct a new pump station and replace or rehabilitate over three miles of sanitary sewers. This upgrade will help alleviate wastewater overflow and reduce basement backups for the 1.4 million residents served by Metropolitan St. Louis Sewer District and improve water quality in Deer Creek. The District expects to save up to $15 million by financing the project with a WIFIA loan and create 70 jobs.

Sponsored Recommendations

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.
April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...
April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...
March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track