WIFIA Program closes loan with Metropolitan St. Louis Sewer District

Dec. 21, 2018
  EPA's total credit assistance is now over $1.5 billion.  

ST LOUIS, DEC 21, 2018 -- The Metropolitan St. Louis Sewer District's $47.7 million loan will construct a new pump station and replace or rehabilitate over three miles of sanitary sewers. This upgrade will help alleviate wastewater overflow and reduce basement backups for the 1.4 million residents served by Metropolitan St. Louis Sewer District and improve water quality in Deer Creek. The District expects to save up to $15 million by financing the project with a WIFIA loan and create 70 jobs.

Sponsored Recommendations

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Rising Cyber Threats and the Impact on Risk and Resiliency Operations

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track