North Dakota’s Grand Forks Regional Water Treatment Plant worked with Sherwin-Williams Protective & Marine to ensure timely service and coating deliveries.

Exhibitor Promotion
Presented by Sherwin-Williams

Staying on schedule was critical when the City of Grand Forks, N.D., built its new Grand Forks Regional Water Treatment Plant. That’s why project managers made strategic coating selections that removed days from various plant projects. It’s also why they worked with Sherwin-Williams Protective & Marine to ensure timely service and coating deliveries.

With efficiency in mind, the team shifted its specification from a five- to six-coat lining system to a one-coat system to line five membrane bioreactor (MBR) basins. That move alone saved applicators at least an entire day per basin. Other efficiencies ultimately saved them more than two weeks on the project.

The originally specified system — a concrete resurfacer, moisture barrier, epoxy base coat, fiberglass mat and epoxy topcoat — would have required about three days to line each roughly 25-foot-wide by 30-foot-long basin. Using Poly-Cote™ 115 from Sherwin-Williams instead, the basins could be ready for service in less than two days. The 100 percent solids, elastomeric polyurethane’s optimal build properties enabled applicators to spray it at the same thickness as the five- to six-coat system in a single pass.

To line the basins, applicators from Champion Coatings first sandblasted the concrete and then applied Dura-Plate® 2300. This epoxy-modified cementitious resurfacer filled in imperfections in the concrete and created a durable surface with excellent adhesion for the lining system. Further ensuring adhesion, applicators next applied a primer coat of Dura-Plate 235 as a barrier to prevent moisture and air from escaping the concrete and creating pinholes in the lining. Due to the fast return-to-service time for Dura-Plate 2300, as well as no need to complete a sweep blast on the resurfacer before coating it, Champion Coatings could complete the resurfacing and primer applications on the same day.

The next day, applicators applied the Poly-Cote 115 lining system, spraying it between 65 and 100 mils dry film thickness (DFT) in a single pass for a high-build lining that has the same thickness in one coat as the originally specified multicoat system. Applicators were able to complete each basin within two days – and sometimes even all on the same day. The five- to six-coat system would have required at least three or more days.

Applicators from Traill Painting also realized efficiencies when applying a heavy-duty, graphite-filled lining system on a secondary containment vessel designed to capture hydrofluorosilicic acid. They first prepared the concrete vessel’s surface to remove contaminants and then primed it with Corobond® Vinyl Ester Primer to promote adhesion of the top layers. Next, the crew applied Poly-Glass™ Putty resurfacing compound to fill in any voids and bugholes in the concrete surface before applying two coats of Cor-Cote® VEN GF, a graphite-filled epoxy novolac-based vinyl ester, to protect the containment area.

Efficiencies came into play for all the Sherwin-Williams products used thanks to the company’s technical support team, which ensured contractors applied the systems correctly. WW

Sherwin Williams is exhibiting at WEFTEC21, booth 835. To learn more, visit www.sherwin-williams.com.

Sponsored Recommendations

SmartSights WIN-911 Alarm Notification Software Enables Faster Response

March 15, 2024
Alarm notification software enables faster response for customers, keeping production on track

Automated Fresh Water Treatment

March 15, 2024
SCADA, Automation and Control for Efficient and Compliant Operations

Digital Transformation Enables Smart Water

March 15, 2024
During this webinar we will discuss factors driving the transformation to digital water, water industry trends, followed by a summary of solutions (products & services) available...

Smart Water Solutions: Transforming the Water Universe

March 15, 2024
Water is our most valuable resource, and efficient and effective water and wastewater handling is crucial for municipalities. As industry experts, you face a number of challenges...

Request More Information

By clicking above, I acknowledge and agree to Endeavor Business Media’s Terms of Service and to Endeavor Business Media's use of my contact information to communicate with me about offerings by Endeavor, its brands, affiliates and/or third-party partners, consistent with Endeavor's Privacy Policy. In addition, I understand that my personal information will be shared with any sponsor(s) of the resource, so they can contact me directly about their products or services. Please refer to the privacy policies of such sponsor(s) for more details on how your information will be used by them. You may unsubscribe at any time.